Aeternus Power

Commercial solar in Massachusetts in 2026: SMART 3.0, net metering and taxes

Aerial view of hangars at the airport in Barnstable, Massachusetts, two of them with rows of solar modules on their rooftops, light aircraft parked on the apron and stores and parking lots beyond
Photo: MassDOT / Wikimedia Commons, public domain

Massachusetts pays for business solar mainly through SMART 3.0, an incentive per kWh paid by your utility for 20 years, alongside net metering credits and a 20-year property tax exemption. For 2026, SMART’s base rate for plants from 25 to 250 kW (ac) is 28.07 cents per kWh; behind your meter, the incentive is that rate, plus adders, minus the value of its energy.

In short

  • Massachusetts supports business solar with SMART 3.0 payments for 20 years, net metering credits and a 20-year property tax exemption.
  • For 2026, SMART’s base rates run from 17.90 to 28.07 cents per kWh by plant size, before adders such as 3 cents for building-mounted plants.
  • Check the 2027 rates due by December 1, 2026, whether your plant is exempt from the net metering caps, and your town’s property tax treatment.

What do businesses pay for electricity in Massachusetts?

In August 2026, businesses in Massachusetts paid an average of 24.11 cents per kWh, up from 23.15 cents in August 2025, according to preliminary data from the US Energy Information Administration (EIA). The US average was 14.47 cents. Industrial customers in Massachusetts paid 20.03 cents, against 19.17 cents a year earlier.

Many business rates also charge for demand, in kW. National Grid’s G-2 rate, for businesses using more than 10,000 kWh a month with demand of up to 200 kW, charges $45 a month plus $15.06 per kW of demand in distribution charges, at rates in effect from July 1, 2026. Demand is the highest 15-minute peak of the month, so 50 kW less peak would save $753 a month on that charge (our calculation).

A solar plant lowers the energy you buy; to lower the peak itself you need a battery or control of your largest loads. SMART pays extra for a battery paired with the plant, as explained below.

AreaAugust 2026 (¢/kWh)August 2025 (¢/kWh)Change
Massachusetts24.1123.15+4.1%
Rhode Island23.3122.23+4.9%
New York23.0622.33+3.3%
Maine21.3321.25+0.4%
New Hampshire20.9920.43+2.7%
Vermont20.4719.05+7.5%
Connecticut19.2923.47-17.8%
United States14.4713.87+4.3%

Commercial sector. Changes are our calculation from EIA data. EIA’s next release is due November 24, 2026.

How does the SMART 3.0 program pay a business plant?

The Solar Massachusetts Renewable Target (SMART) program is the state’s solar incentive, run by the Department of Energy Resources (DOER). Its current version, SMART 3.0, is set out in 225 CMR 28.00 and took its first applications on October 15, 2025. Your utility pays the plant’s owner for each kWh produced, for 20 years from the date payments start, and receives the plant’s renewable energy certificates in return.

For a plant over 25 kW (ac) behind your meter, SMART sets a total compensation rate: a base rate for the plant’s size plus any adders. The utility pays the difference between that rate and the value of the plant’s energy, which is the sum of your own distribution, transmission and transition charges per kWh and the average basic service charge of the past three calendar years. That payment per kWh is set when the plant receives its Final Statement of Qualification and stays the same for the 20 years. Plants of 25 kW or less receive a flat rate instead: 3 cents per kWh in 2026.

Because the value of energy depends on your utility and your rate class, DOER publishes a calculator for 2026. Ask for the figure for your own rate before you compare offers.

Plant size (ac)Base rate (¢/kWh)
Over 25 kW to 250 kW28.07
Over 250 kW to 500 kW24.30
Over 500 kW to 1,000 kW23.17
Over 1,000 kW to 5,000 kW17.90

As of November 18, 2026. Plants of 25 kW or less get a flat 3 cents per kWh, or 6 cents for low-income units. DOER sets the rates for each program year; the 2027 rates are due by December 1, 2026, and no rate may move by more than 20 percent or one cent per kWh, whichever is greater, from one year to the next.

Which SMART adders, capacity limits and battery rules apply?

Adders raise the rate for certain sites and customers. A plant over 25 kW can combine its base rate with at most one location adder and one adder for the type of customer it serves, and a brownfield adder does not count toward that limit. For 2026, DOER set, in cents per kWh: 3 for a building-mounted plant, 4 for a large building-mounted plant of 900 kW (ac) or more, 8 for a canopy, 4 for a brownfield, 6 for a landfill and 4 for a plant serving a public entity.

Capacity is limited. Each program year runs from January 1 to December 31: in its first 10 business days, applications are ranked by the date of their interconnection application, and after that capacity goes first come, first served, with a waitlist. For 2026, DOER made 600 MW (ac) available; its draft report for 2027, published in October 2026, proposes 300 MW. Behind-the-meter plants from 25 to 250 kW, and plants of 25 kW or less, do not count toward that cap unless DOER sets a separate allocation for them.

Batteries earn an adder calculated from their power and hours of storage relative to the plant, using a multiplier DOER set at 4 cents per kWh for 2026. To qualify, the battery needs at least 25 percent of the plant’s DC capacity, at least two hours of storage and a round trip efficiency of at least 65 percent; it must be available for at least 85 percent of the summer and winter peak periods, and complete 100 full cycles a year or join a demand response program. A plant over 1,000 kW that earns no location adder must have a battery.

To apply, a plant over 25 kW needs an executed interconnection service agreement with your utility, the right to use the site and its main permits. A preliminary statement of qualification then reserves its rates for at least 24 months while it is built; the final statement comes once the utility authorizes it to connect. For applications in 2025 and 2026, significant work on site must not have begun before June 20, 2025.

Does Massachusetts still have net metering for businesses?

Yes, under M.G.L. c. 164, §§ 138 to 140 and the rules of the Department of Public Utilities (DPU), 220 CMR 18.00. Solar plants fall into three classes: Class I up to 60 kW, Class II above 60 kW and up to 1 MW, and Class III above 1 MW and up to 2 MW. When the plant produces more than the site uses in a billing period, the utility turns the excess into a net metering credit, carries any balance forward and, if you ask in writing, allocates credits to other accounts in Massachusetts.

The credit depends on the plant. For a solar plant of 25 kW or less, each excess kWh is credited at the sum of your basic service, distribution, transmission and transition charges per kWh. A new business plant above that size receives market net metering credits, worth 60 percent of that sum; plants of public entities that allocate credits only to other public entities keep 100 percent.

Two caps apply. Private net metering plants may not exceed, together, 7 percent of each utility’s highest historical peak load, and public ones 8 percent, with solar counted at 80 percent of its DC rating. But plants of 25 kW or less, and plants over 25 kW that serve load on site and signed their interconnection agreement on or after January 1, 2021, are exempt from the private cap. For those on-site plants, credits above the site’s use from April to the following March are credited or paid at the utility’s avoided cost rate.

PlantCredit per excess kWhNet metering cap
Solar, 25 kW or less100 percent of basic service, distribution, transmission and transition chargesExempt
New solar over 25 kW serving load on site, interconnection agreement from January 1, 202160 percent of the same charges; credits above the site’s yearly use paid at avoided costExempt from the private cap
Other new private solar plants60 percent of the same chargesCounts toward the 7 percent private cap
Public entity plants allocating credits to public entities100 percent of the same chargesCounts toward the 8 percent public cap

As of November 18, 2026, under 220 CMR 18.00 and M.G.L. c. 164, § 139. Plants on 100 percent credits move to market credits 25 years after they connect, and utilities may propose a monthly minimum reliability contribution, subject to DPU approval.

Which tax breaks apply to a solar plant in Massachusetts?

Property tax. Clause 45 of M.G.L. c. 59, § 5 exempts an owned or leased solar system, with or without a battery on site, from local property tax for 20 years, if it can produce no more than 125 percent of the yearly electricity needs of the property it sits on, if it is 25 kW or smaller, or if its owner has signed a payment in lieu of taxes (PILOT) agreement with the town. The property may include other parcels in the same town in which there is a common ownership interest, and a written agreement with the town can extend the exemption beyond 20 years.

So a business plant sized to the site’s own use can qualify for 20 years, while a larger plant qualifies only under a PILOT agreement. Ask your town’s assessor how it applies the clause before you size the plant.

Corporate excise. M.G.L. c. 63, § 38H lets a business corporation elect to deduct, in the year it pays them, its costs of installing solar or wind powered heating, cooling and water heating units, or other units or systems powered by them, used only in its business in Massachusetts. The deduction replaces depreciation on those costs, needs equipment certified by the state’s building construction office and is recaptured if the use changes within 10 years; qualifying units are also left out of the tangible property measure of the excise. The section speaks mainly of heating and cooling units, so ask your CPA whether it applies to a solar electric plant.

Sales tax. Massachusetts exempts equipment for a solar, wind or heat pump system only when it supplies an individual’s principal residence (M.G.L. c. 64H, § 6(dd)), so a business plant does not qualify under that clause.

Federal credit. A business that owns the plant may be able to claim the federal clean electricity investment credit, but for solar it now depends on when construction starts and when the plant is in service: see the US solar tax credit in 2026. Confirm each of these points with a CPA or tax adviser.

Can another company own the plant, and how does it connect?

Yes, another company can own it. DSIRE, the database of state energy policies run by the NC Clean Energy Technology Center, lists Massachusetts among the states where third-party solar power purchase agreements (PPAs) are authorized or in use, citing the net metering rules. SMART 3.0 provides for a third-party owner that has a PPA, a lease or another arrangement with the customer, and the property tax exemption covers leased systems. Under a PPA, another company owns the plant and sells you its power at a price set in the contract; what is a PPA explains how it works, and third-party solar PPAs by state compares the states.

Your utility connects the plant under interconnection tariffs approved by the DPU, which cover the studies, the metering and any grid upgrades, with their cost and timing (M.G.L. c. 164, § 139(d)). A plant over 25 kW needs the executed interconnection service agreement before it can apply to SMART, so start that process early and ask your utility how long reviews are taking on your circuit.

How Aeternus helps

Aeternus Power is an independent energy company based in Madrid. We originate, qualify, structure and finance energy projects, solar-led and with storage, and bring in the builders and financing partners for each one. We never own the plants. A commission is paid by whoever builds or finances the project, never by you, and only if the project goes ahead.

Our office in California opens on December 1, 2026, and we have no office in Massachusetts. If you tell us about your site, with where it is, which utility serves it and how much power it uses in a year, we will say within two working days whether we can help there. How we work with businesses is on our business page.

Questions

How much does SMART 3.0 pay for commercial solar in 2026?

SMART’s 2026 base rates run from 28.07 cents per kWh for plants over 25 kW and up to 250 kW (ac) to 17.90 cents for plants of 1 to 5 MW, plus adders such as 3 cents for building-mounted plants. For a plant behind your meter, the utility pays that total minus the value of the plant’s energy, for 20 years. The 2027 rates are due by December 1, 2026.

Is there still a net metering cap in Massachusetts?

Yes: private net metering plants may not exceed, together, 7 percent of each utility’s highest historical peak load, and public ones 8 percent. Plants of 25 kW or less, and plants over 25 kW serving load on site with an interconnection agreement signed on or after January 1, 2021, are exempt from the private cap.

What happens to excess net metering credits in Massachusetts?

Credits carry forward from one billing period to the next, and you can allocate them in writing to other accounts in Massachusetts. For a plant exempt from the cap because it serves load on site, credits above the site’s use from April to the following March are credited or paid at the utility’s avoided cost rate.

Is commercial solar exempt from property tax in Massachusetts?

It can be, for 20 years, under clause 45 of M.G.L. c. 59, § 5. An owned or leased system qualifies if it produces no more than 125 percent of the property’s yearly electricity needs, is 25 kW or smaller, or is covered by a PILOT agreement with the town. Ask your assessor, and confirm with a CPA or tax adviser.

Do businesses pay sales tax on solar equipment in Massachusetts?

The state’s solar exemption does not help a business: M.G.L. c. 64H, § 6(dd) covers equipment for systems supplying an individual’s principal residence. Ask your CPA whether any other exemption applies to your purchase.

Is the federal solar tax credit still available for businesses in Massachusetts?

For a solar plant whose construction starts now, the owner can claim the federal credit only if the plant is in service by December 31, 2027; batteries are not bound by that date. The rules are in the US solar tax credit in 2026. Confirm your case with a CPA or tax adviser.

Sources

  • EIA: Electric Power Monthly, Table 5.6.A, average price of electricity by sector and state, August 2026 and 2025 (released October 23, 2026): https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_a
  • Massachusetts DOER: SMART 3.0 program details, rates, capacity and regulatory updates (October 2026): https://www.mass.gov/info-details/smart-30-program-details
  • Massachusetts DOER: 225 CMR 28.00, Solar Massachusetts Renewable Target (SMART) Program 3.0, regulation text (January 2026): https://www.mass.gov/doc/225-cmr-2800-1/download
  • 220 CMR 18.00: Net metering, sections 18.02 to 18.07, as amended December 20, 2024 (Legal Information Institute): https://www.law.cornell.edu/regulations/massachusetts/department-220-CMR/title-220-CMR-18.00
  • Massachusetts Legislature: General Laws, chapter 164, section 139, net metering: https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXXII/Chapter164/Section139
  • Massachusetts Legislature: General Laws, chapter 59, section 5, clause 45, solar and wind powered systems: https://malegislature.gov/Laws/GeneralLaws/PartI/TitleIX/Chapter59/Section5
  • Massachusetts Legislature: General Laws, chapter 63, section 38H, deduction for solar or wind powered units: https://malegislature.gov/Laws/GeneralLaws/PartI/TitleIX/Chapter63/Section38H
  • Massachusetts Legislature: General Laws, chapter 64H, section 6, sales tax exemptions, clause (dd): https://malegislature.gov/Laws/GeneralLaws/PartI/TitleIX/Chapter64H/Section6
  • National Grid (Massachusetts Electric): Summary of electric delivery service rates, M.D.P.U. No. 1-26-G (effective July 1, 2026): https://www.nationalgridus.com/media/pdfs/billing-payments/electric-rates/ma/2026/0726meco.pdf
  • National Grid (Massachusetts Electric): General service demand rate G-2, M.D.P.U. No. 1547 (effective October 1, 2024): https://www.nationalgridus.com/media/pdfs/billing-payments/tariffs/mae/meco_g2.pdf
  • DSIRE, NC Clean Energy Technology Center: third-party solar PV power purchase agreement policies, map with authorities (May 2026): https://ncsolarcen-prod.s3.amazonaws.com/wp-content/uploads/2026/05/DSIRE_3rd-Party-PPA_May2026.pdf
  • IRS: Instructions for Form 3468 (2025), termination of the credit for solar placed in service after 2027 (updated August 28, 2026): https://www.irs.gov/instructions/i3468

Latest

Solar PPAs for businesses in California: how they work and what to check

How to choose a home solar company in California

Germany’s power prices are the highest since 2022, and transmission fees rise by almost a quarter in 2027

Talk to us